Following comments from drivers about the long delays on Buxton Road, please find below some information as to why this is:
- It is only recently that the SCOOT system has been introduced in the Boot Hill corridor, which is the element that links the junctions and allows them to react to traffic flows and learn traffic patterns/behaviour.
Now this system is in operation the corridor should become more responsive, however, the full benefits won’t be seen until all the junction works are complete.
- The phasing of the Wyke Road junction does mean that northbound drivers will have a quicker journey time using Portland Road and Wyke Road to get onto Boot Hill.
This is why, as part of the Weymouth Transport Package, improvements are being made to the junction by All Saints Church.
The phasing at the Wyke Road junction has allowed the controlled pedestrian crossings to be installed.
Also, because of the narrow road width, if northbound and southbound traffic were to run at the same time a single vehicle wishing to turn right would bring southbound traffic to a standstill.