It has been confirmed that the work to install and connect additional detection equipment at Harbour Crossroads on 6 April will be carried out from 6.30pm.
The signals will be switched off and the junction will be controlled by four-way temporary lights while the work is done. The junction signals should be back on between 10pm and 11pm.
The work is weather dependent and will need to be rescheduled if it is raining.